Introduction to PRINCE2

From PRINCE2 wiki
Revision as of 12:30, 3 February 2019 by Frank (Talk | contribs) (Reference)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

PRINCE2 Content

The official manual states that the PRINCE2® method consists of 4 main parts, or Integrated Elements. These elements are:

Components.jpg

You can find more about the PRINCE2 content on the PRINCE2 methodology page.

Reference

PRINCE2 Courses

PRINCE2 Exams

Other PRINCE2 Links

PRINCE2® is a registered trade mark of AXELOS Limited, used under permission of AXELOS Limited. All rights reserved.